top of page

North Pacific

The North Pacific Project of the Ministry of Communications and Transport, which lasted 9 years, TEMOCSA played the role of Independent Engineer

Independent Engineer for monitoring and control of work (physical-financial progress), quality control verification, according to the technical specifications of the Executive Project.


The North Pacific Project aims to guarantee access and expand transportation and communications infrastructure and services, providing reliable and quality services to the entire population.


Cuiliacan Bypass, Sinaloa:

· Roads Length: 21.5 Km

· Corridor: Mexico-Nogales with branch to Tijuana


The section has 34 bridges with a total length of approximately 2,484.61 m. In both bodies. 5 underpasses (PIV) of one and two lanes with a length of 409.40 m. of total bridge length.

 

Mazatlan Bypass, Sinaloa

· Roads Length: 38.0 km

· Corridor: Mexico-Nogales with branch to Tijuana.


The project has 7 grade-separated junctions of different types, with an average length of 4.25 km, branches and loops with a total of 11 structures at the junctions, a main toll plaza and five secondary ones, in addition to 4 bridges with a total length of approximately 1029 meters, 14 one- and two-lane vehicular underpasses (PIV) and 8 overpasses (PSV).

bottom of page