Las Varas-Puerto Vallarta Highway
Construction of federal highway where TEMOCSA performs Construction Supervision
Construction of a 90.28 km highway, consisting of an 83.61 km trunk road with an additional 6.68 km of branches (5.45 km of the airport junction and 1.23 km of the Km 692 branch).
In addition, it will have 7 junctions, 6 at different levels with their respective structures and 1 at ground level, it will include 1 body with 2 traffic lanes (one in each direction) each 3.50 meters wide and 2.50 meter shoulders at both ends.
In this project that is in progress, we play the role of construction supervisor for intensive monitoring, identification of risks and incidents, timely verification of compliance with the executive project, recommendations of good practices, calculation of physical-financial progress and projections of flow and execution of the project.
We carry out constant visits to the site to verify the progress and quality of the work, we generate specific comments on the documents that make up the project and we report progress in the 3D BIM MODEL.